Installation - GBC Falcon 60+ Operation Manual

Ce laminator
Table of Contents

Advertisement

Operations Manual

Installation

1. Shipping damage should be brought to the imme-
diate attention of the delivering carrier.
2. With assistance, carefully roll the laminator into posi-
tion over flat and even surfaces.
3. The laminator should be positioned to allow exiting film
to flow freely to the floor (Figure 3) or a work table.
Accumulation of laminate immediately behind the lami-
nator as it exits the equipment may cause the film to
wrap around the pull rollers, resulting in a "jammed"
condition.
4. Avoid locating the laminator near sources of heat or
cold. Avoid locating the laminator in the direct path of
forced, heated or cooled air.
5. Leveling of the machine is a customer option. If you
choose not to level the laminator and encounter output
problems, please level the machine and try your
application again before calling for technical support.
Resting the laminator on the leveling pads prevent
the machine from rolling during set up, operation or
servicing. (Figure 4)
6. Connect the attachment plug provided with the
laminator to a suitably grounded outlet. AVOID
CONNECTING OTHER EQUIPMENT TO THE
SAME BRANCH CIRCUIT TO WHICH THE LAMI-
NATOR IS CONNECTED, AS THIS MAY RESULT
IN NUISANCE TRIPPING OF CIRCUIT BREAKERS
OR BLOWING FUSES.
©2004 General Binding Corporation
60+ (-1)
FALCON
Fig 3
x 4
Fig 4
CE
Page 15

Advertisement

Table of Contents
loading

Table of Contents