Open For Service - Verizon Smart-Cell User Manual

33 dbm
Table of Contents

Advertisement

3) Isolation check between DONOR/SERVEICE ANT
① Isolation condition of this equipment is 105dBc (Gain+15dB). User should check
its condition before installation.

4.1.2. Open for Service

1) Check points before open:
① Verification of system installation status :
 Electricity, In/Out antennas, cable connection, and equipment mount status.
② Verification of system accessories :
 User should check all necessary accessories.
③ Check receipt signal level :
 Installer should check whether environmental conditions are in accordance
with system specification to ensure that system operation will be optimized.
2) Check points after open:
① Check external LED
 RUN: Green light ON (Off: all lights off)
 ALARM: Green light in normal status, Red light in alarming
 SHUT DOWN: Green light in normal status, Red light in Shutdown status
19
Verizon User Manual
Smart-Cell Repeater

Advertisement

Table of Contents
loading

Table of Contents