Download Print this page

Insignia INS8727 Installation Manual page 18

Advertisement

www.insigniarange.com
Last Modified: 08/02/2018
Hand Shower
Attach the chrome riser bar to the glass wall ensuring the water inlet is inserted
through the lower large hole and hand tightened from the rear side.
Now tighten the chrome shower holder ensuring that this will take the hand shower
itself without falling (please note over tightening will prevent the holder from sliding
up and down)
Thermostatic Probe
Insert the probe into the hole situated below the control panel roughly 6mm into the
cabin and run clear silicone around the rear side of the probe
Ozone (o3)
Unscrew the chrome pepper pot end and drop the white box upside down into the
rear hole as shown in the image. Now from the inside of the shower re-attach the
chrome pepper pot end and tighten.
Monsoon Head
Attach the grey hose from your valve to the inner black tube using PTFE tape
(please note this only needs to be hand tight. Over tightening will snap/damage the
inner black tube)
Handle
Ensuring that the inner thread is protruding out from the handle far enough, place
the handle on the outside of the door and secure by tightening the inner chrome
knob to the protruding inner thread.
Please see your AMI system installation guide for further details
18

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Ins8728