Erecting Procedure - Celina HGPTS Instruction Manual

Humanitarian and general purpose tent system
Table of Contents

Advertisement

5. Locate and slide all four of the side tee fittings (F02STHT) into the hip raf-
ter poles (Green/HT2GST80). Lining up the holes until the push pins engage.
6. Connect each of the 88" (223.52 cm) spreader poles (Red/HT2GST88)
between each corner (F01CORHT) and each side tee fittings (F02STHT)
all the way around the perimeter of the frame. Lining up the holes until the
push pins engage.
8

Erecting Procedure

Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)

Advertisement

Table of Contents
loading

Table of Contents