Celina HGPTS Instruction Manual

Humanitarian and general purpose tent system

Advertisement

Quick Links

Humanitarian and General
Purpose Tent System
(HGPTS)
NSN: 8340-01-535-6379 (FEMA MOD 2015)
INSTRUCTION MANUAL
ERECTION AND STRIKE PROCEDURES
Manufactured By:
CELINA TENT INC.
5373 State Route 29
Celina, Ohio 45822-9210 USA
www.CelinaTent.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HGPTS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Celina HGPTS

  • Page 1 Humanitarian and General Purpose Tent System (HGPTS) NSN: 8340-01-535-6379 (FEMA MOD 2015) INSTRUCTION MANUAL ERECTION AND STRIKE PROCEDURES Manufactured By: CELINA TENT INC. 5373 State Route 29 Celina, Ohio 45822-9210 USA www.CelinaTent.com...
  • Page 2 Introduction ............3-4 Parts Breakdown..........5-6 Erecting Procedure.........7-17 Strike Procedure...........18-19 Repackaging Procedure.......20-22 Repair Procedure..........22 Care and Safety...........23 Replacement Parts / Accessories.....23 CELINA TENT INC. 5373 State Route 29 Celina, Ohio 45822-9210 USA www.CelinaTent.com Fax: 419-584-0949 Phone: 419-586-3610 © 2015 Celina Tent Inc.
  • Page 3: Introduction

    INTRODUCTION Celina’s General Purpose / Humanitarian Shelter is a non-tactical shelter designed to offer an economical solution for humanitarian aid in the event of a natural disaster or conflict worldwide. General purposes include: Medical facilities, billeting, field services, and storage.
  • Page 4: Introduction

    Repair kits are available for the tent membrane & floor. wCapable of withstanding all weather conditions except arctic. wWater resistant wFlexible/abrasion resistant wCompactable/Portable wOptional mosquito netting allows additional ventilation Introduction Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 5 Storage Bag Containing Tent Membrane & Floor Black Mesh Mosquito Net Sidewalls QTY. 4 QTY. 4 QTY. 4 QTY. 4 QTY. 8 QTY. 16 QTY. 8 QTY. 14 QTY. 8 QTY. 1 QTY. 16 QTY. 4 QTY. 1 Parts Breakdown http://www.hgpts.com/disaster-relief-shelter-instructional-manual...
  • Page 6: Parts Breakdown

    PARTS BREAKDOWN SIDE VIEW TOP VIEW Parts Breakdown Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 7: Erecting Procedure

    8 way crown (F048WCHT). Lining up the holes until the push pins engage. 4. Locate all four corner (F01CORHT) fittings and slide the hip rafter poles (Green/HT2GST80) on, lining up holes until push pins engage. Erecting Procedure www.HGPTS.com...
  • Page 8: Erecting Procedure

    (F01CORHT) and each side tee fittings (F02STHT) all the way around the perimeter of the frame. Lining up the holes until the push pins engage. Erecting Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 9 (F01CORHT) and pin using pin & bail (HT570). Slide the pin through the hole in the corner fitting and leg hole then connect the bail end around the pin. Erecting Procedure www.HGPTS.com...
  • Page 10 & bail. 12. Put the other four legs with base plates on the bottom of all of the side tee fittings and pin with pin & bail. Erecting Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 11 15. Attach the floor by snapping the spring snaps to the inside 3/4” hole on each base plate at each corner. Connect the spring snap to the inside slot for remaining poles locations. Connect the hook and loop around the legs and kick the legs out until the floor is tight. Erecting Procedure www.HGPTS.com...
  • Page 12 D rings and then back through the lower D ring. Pull the tail end downward to tighten. Use a foot if necessary to tighten the straps. Erecting Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 13 To find the door bay stand under the center of the tent facing the direction of the roof vent. The door bay is directly in front on the left. Door Bay 21. Take the strap down to the open slot on the corresponding side of each base plate, and pull tight. Erecting Procedure www.HGPTS.com...
  • Page 14 23. Pull the sides down off of the tent top. 24. Close all corners by connecting all of the side release buckles and NOTE: Door must be closed prior to tightening side release tightening. buckles. Erecting Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 15 Tie off with window tie tie. roll in the correct direction to prevent collecting water. 27. To roll up the door stand inside the tent, tightly roll up on top of the door. Tie off with tie tie. Erecting Procedure www.HGPTS.com...
  • Page 16 31. To close the peak vent, loosely hold on to the rope. Walk around to the vent side of the tent and pull on the rope until the flap is closed. Erecting Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 17 D ring. Hang the D ring 2-3 feet below the center of the 8 way crown. Attach the spring snaps to the D rings on the fitting or to the wire bail on the pin & bails. Erecting Procedure www.HGPTS.com...
  • Page 18 5. Loosen all of the tent top straps (8 total) removing the straps from the slots on the baseplates. 6. Remove the four middle legs with base plates and place off to the side. Strike Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 19: Repackaging Procedure

    (see Repackaging Procedure). 11. Separate all the legs from the base plates. 12. Disassemble all of the fittings from the poles by pushing in on the push pins to release them and then sliding the pole off. Strike Procedure www.HGPTS.com...
  • Page 20: Repackaging Procedure

    REPACKAGING PROCEDURE 1. Lay the complete HGPTS tent top out as flat as possible. 2. Fold all four sidewalls in towards the center of the tent top. 3. Set the floor on top of the tent top. Repackaging Procedure Celina Tent Inc. - HGPTS - NSN: 8340-01-535-6379 (FEMA MOD)
  • Page 21 7. Connect the male and female side release buckles long way first and pull tight. 8. Join the remaining three side release buckles and pull tight. If the three side release buckles are tightened all the way the bag should fit into the crate. Repackaging Procedure www.HGPTS.com...
  • Page 22: Repair Procedure

    REPACKAGING PROCEDURE Cont. 10. Place all fittings, straps, stakes, 9. Place all poles in crate. & pin & bails in crate. 11. Place tent membrane in crate and close. REPAIR PROCEDURE 1. To repair a tear in the fabric, first clean the surface where the patch is to be applied.
  • Page 23 5/8” x 24” (1.5875 cm x 60.96 cm) Hook Stakes – HT560 ¼” (0.635 cm) Black Rope – 10079 Side Release Buckles (Male & Female) – HT935 Roof Vent – HT108 Floor – HT305 Tent Bag – HT790 ACCESSORIES Field Repair Kit– ACVRKHT HGPTS www.HGPTS.com...
  • Page 24: State Route

    CELINA TENT INC. 5373 State Route 29 Celina, Ohio 45822-9210 USA www.CelinaTent.com Fax: 419-584-0949 Phone: 419-586-3610...

Table of Contents