1. Layout all the fittings and poles. Set the 8 way crown (F048WCHT) so the
four blue posts (that do not touch the ground) are pointed towards the corners.
2. Slide the ends of the hip swage pole (Blue/HT2GST56S) onto the hip
rafter pole (Green/HT2GST80). Slide the ends of the rafter swage (Yel-
low/HT2GST20S) onto the remaining hip rafter poles (Green/HT2GST80).
Slide the ends of the hip swage poles onto the corner posts on the 8 way
crown. Lining up the holes until the push pins engage.
3. Take the combined hip rafter poles (Green/HT2GST80) and slide onto
the remaining post slots on the 8 way crown (F048WCHT). Lining up the
holes until the push pins engage.
4. Locate all four corner (F01CORHT) fittings and slide the hip rafter
poles (Green/HT2GST80) on, lining up holes until push pins engage.