Arjohuntleigh Citadel Instructions For Use Manual page 7

Bed frame system
Hide thumbs Also See for Citadel:
Table of Contents

Advertisement

The weighing system MUST be zeroed every time a new patient
is to be placed on the bed.
The weighing system MUST be zeroed every time a mattress is
changed.
The weighing system cannot be zeroed if a mattress or
accessories weighing more than 50 kg (110 lb) are fitted.
Data retrieved from the RS232 connection is not intended to be
used to make clinical decisions. All patient diagnosis, treatment
and care should be performed under the supervision of an
appropriate healthcare professional.
The manual CPR release should only be used in an emergency;
repeated everyday use can cause permanent wear.
Disconnect the bed from the mains wall outlet before starting
any cleaning or maintenance activity. The bed will still operate
on battery power if the function has not been locked on the
Attendant Control Panel.
To prevent cross contamination or equipment damage,
ArjoHuntleigh recommends that the Citadel Bed Frame System
be cleaned during use and between patients according to the
Care and Cleaning section in this IFU. Local protocols and
regulations / procedures for blood borne pathogens may be used
provided the manufacturer's instructions are followed.
Always disconnect the Citadel Bed Frame System from mains
wall outlet before cleaning. Failure to do so could result in
equipment damage and / or electric shock.
Do not allow fluids to penetrate the Citadel Bed Frame System
control panels to avoid damage to system.
If the bed is stored for a long time, it should be connected to the
electricity supply for 24 hours every three months to recharge the
backup battery, otherwise it may become unserviceable.
Citadel Bed Frame System
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents