Technical Specifications; Installation - Omcan BS-VE-3200-S Instruction Manual

Table of Contents

Advertisement

Technical Specifications

Model
Power
Blade Length
Blade Saw Dimensions
Cutting Capacity
Electrical
Amps
Weight
Packaging Weight
Packaging Dimensions
Item Number

Installation

Be sure to install the bandsaw in an easily accessible area with plenty of space.
Grounding wire must always be connected.
IMPORTANT: Check the tension of the blade by turning the handle clockwise before operating it.
Operation
BEFORE OPERATION
Check and make sure the machine is in a stable location. Wash with warm water and soap all the food-contact
parts, and wipe dry. To do it proceed as follows:
1. Switch the machine off and disconnect it from the power source.
2. Open the upper door and lower door by pulling the handle.
3. Loosen the blade turning the handle or calibrator (optional) clockwise and take it out from the upper and
lower wheels.
4. Take out the staples which are in front of the upper and lower wheels to be able to pull them out.
5. Assemble the components following the inverse steps.
IMPORTANT: The blade must be well calibrated. Use the handle turning it clockwise to get the right
tension of the blade. Keep the machine off to adjust the cutting regulator.
BS-VE-3200-S
3 HP / 2.24 kW
126" / 3200mm
0.8" x 12.6" / 20 x 320mm
15" x 18" / 381 x 457mm
220V / 60 Hz / 1 Ph
11A
374 lbs. / 170 kgs.
415 lbs. / 188 kgs.
40" x 54" x 96" / 1016 x 1372 x 2438mm
10272
6
BS-VE-3200-T
220V / 60 Hz / 3 Ph
9A
18943

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bs-ve-3200-tBs-br-1880Bs-ve-1981-e10270

Table of Contents