Download Print this page

Huawei RTN 360 V100 Quick Installation Manual page 3

Hide thumbs Also See for RTN 360 V100:

Advertisement

Installing an RTN 360
Equipment Components
A
Appearance and ports
Front view
Port GE(e)
Port P&E (receiving both
services and power
signals)
Maintenance
compartment
Rear view
Ground screw
04/05 >>
B
Mounting kits
Inside the maintenance compartment
RSSI/NMS port
USB port
1. Attachment plate (installed before delivery)
2. Hose clamp (used when an RTN 360 is installed on a pole)
Holes for mounting an
alignment scope
3. Azimuth adjustment nut
4. Fastener (with holes used for installing an RTN 360 on a wall or pole)
5. Elevation adjustment nut
C
Ground cable
OT terminal
• The ground terminal can connect to a ground bar or U-shaped ground
clip.
• For information about how to connect the ground terminal to a U-
shaped ground clip, see the usage description document supplied with
the clip.
1
2
3
4
5
Ground terminal
D
USB flash drive
• The recommended USB flash drive is a 4 GB Netac U208. If a
different model or capacity is required, contact the local Huawei
office. USB flash drives not meeting requirements may be
incompatible.
• The appearance of the shipped USB flash drive may differ from
that shown here.
E
Alignment scope
Lens
Mounting frame
Eyepiece

Advertisement

loading