Page 2
All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope.
About This Document About This Document Overview This document describes routine maintenance for an AAU3940 such as equipment maintenance and power-on and power-off operations. It also describes how to replace the AAU, modules in it, and optical modules. Product Version The following table lists the product versions related to this document.
AAU3940 Hardware Maintenance Guide Contents Contents About This Document........................ii 1 Changes in AAU3940 Hardware Maintenance Guide............1 2 Routine Hardware Maintenance Items..................2 3 Powering On and Powering Off an AAU.................4 3.1 Powering on an AAU..............................5 3.2 Powering off an AAU..............................6 4 Replacing an AAU.........................8 5 Replacing the Optical Module....................16...
1 Changes in AAU3940 Hardware Maintenance Guide Changes in AAU3940 Hardware Maintenance Guide This chapter describes changes in AAU3940 Hardware Maintenance Guide. 01 (2015-01-15) This is the first commercial release. Compared with issue Draft A (2014-10-30), no information is added to or deleted from this issue.
The normal input voltage of an AAU is 220 V AC and should range from 200 V AC to 240 V AC. l When an AAU is working properly, the RUN indicator is blinking (on for 1s and off for 1s), and the ALM indicator is steady off. For details about indicators, see AAU3940 Hardware Description. 3.2 Powering off an AAU An AAU can be powered off in two ways: normal power-off and emergency power-off.
Page 22
ALM indicator: steady off l ACT indicator: steady on For details about indicators, see section "Ports and Indicators" in AAU3940 Hardware Description. Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all tools. Step 10 Inform the remote engineer that the AAU has been replaced.
Page 25
Complete the fault form with detailed information about the replaced component. Contact the local Huawei office to handle the faulty component. Issue 01 (2015-01-15) Huawei Proprietary and Confidential...