Do not work with electrical current or work in elevated or exposed locations during a thunderstorm. Anti-corrosion measures are required if an RTN 360 is installed in a location that is prone to corrosion. Contact the local Huawei office for details. A location is prone to corrosion if it is: Extreme weather conditions •Within 3.7 km of an ocean or a salt water lake...
Interior of the maintenance compartment • The recommended USB flash drive is a 4 GB Netac U208. If a different model or capacity is required, contact the local Huawei RSSI/NMS port office to verify compatibility. USB flash drives not meeting USB port requirements may be incompatible.
Page 4
Terminating an Outdoor Network Cable with Shielded RJ45 Connectors Prepare an outdoor network cable Arrange the core wires according to the pin assignments and cut them Prepare the following tools. Strip the cable. and shielded RJ45 connectors. neatly (exposing a length of 12 mm). 8: brown 7: white and brown 6: green...
Page 5
Terminating a Ground Cable with an OT Terminal Strip the ground cable. Mapping between the cross-sectional area of a Fit the exposed cable into the OT terminal. Crimp the OT terminal lug. cable conductor (C) and the length of an exposed cable (L1) A: OT terminal Cross-sectional...
Page 6
Installing an RTN 360 Installing an RTN 360 at the Edge of a Mobile Backhaul Network Installation procedure Install the ground cable. RTN 360 Install an RTN 360 on a pole or wall. Connect one end of an outdoor network cable to port P&E on the RTN 360 and lay out the cable.
Page 7
Installing an RTN 360 Installing RTN 360s at 2x(1+0) Aggregation Sites Installation procedure Install the ground cable. Install an RTN 360 on a pole or wall. RTN 360 Connect an outdoor network cable to port P&E on each RTN 360 and lay out the cable. Optional: Install the RTN 360 on a pole.
Page 8
References for Installation Optional: Installing an RTN 360 on a Pole Pass the hose clamps through the fastener and use the Install the RTN 360 box securely on the fastener. screws provided to secure the hose clamps onto a pole. Before securing the hose clamps, ensure that the azimuth angle faces the peer site.
References for Installation Installing Cables Install a ground cable. Ensure that the OT terminal of the Install an outdoor network cable. ground cable is correctly installed. 1. Unscrew the PG cover installed on port P&E of the RTN 360 using a 1.8 N•m torque wrench. Rotate the wrench counterclockwise.
Page 10
• If you cannot tighten adjustment locking screw 2 using the preceding hex key, contact the local Huawei office to purchase an extension bracket. Align the peer RTN 360 with the local RTN 360 in the same way.
Page 11
References for Installation Powering On an RTN 360 On an RTN 360, only port P&E supports power over Ethernet. Before powering on the equipment, ensure that: •The P&E cable and the PI power cable are installed. •DIP switches are set correctly, and the DIP switch for setting the power over ethernet mode for the used P&E port is turned to the PSE-PD side. After setting the DIP switches, switch off the power supply. After waiting for 6 seconds, switch on the power supply again.
References for Installation Loading Configuration Data and Measuring the RSL Load configuration data. Measure the RSL. WLAN module Close the maintenance compartment. Open the maintenance compartment. RSL tester Web LCT If a WLAN module is installed at the USB port, you can determine whether the WLAN module is working properly If the RSL is lower than the required value, re-align the by enabling it to search for the SSID of an NE in the wireless LAN.