1.
Secure the spreader hopper support pan to the bottom
bolts and nuts.
2.
With the hopper opening facing up, insert the Retainer Bushing through the center hole of the hop-
per. The bushing rim should be on the inside of the hopper against the metal bowl.
3.
Turn the hopper upside down.
4.
Slip the 2-hole (Top Shutter Plate Flow Control) Galvanized disc over the bushing and against the
hopper bottom.
5.
Do the same with the 3-hole (Bottom shutter Plate Directional Control) Galvanized disc. Im-
portant: See photo to be sure the discs are flipped the proper way.
6.
Put the 4 3/8" washer over the Retainer bushing.
Secure everything in place with the spanner nut or snap ring.
IMPORTANT: Make sure both holes can be exposed after the discs are assembled. If not assem-
bled correctly, the openings will not line up when the gates are supposed to be open.
Assembly
Hopper
8
of the hopper with the 4 carriage head