Assembly - Tar River SSP-250 Operator's Manual

Poly fertilizer spreaders
Hide thumbs Also See for SSP-250:
Table of Contents

Advertisement

1.
Secure the spreader hopper support pan to the bottom
bolts and nuts.
2.
With the hopper opening facing up, insert the Retainer Bushing through the center hole of the hop-
per. The bushing rim should be on the inside of the hopper against the metal bowl.
3.
Turn the hopper upside down.
4.
Slip the 2-hole (Top Shutter Plate Flow Control) Galvanized disc over the bushing and against the
hopper bottom.
5.
Do the same with the 3-hole (Bottom shutter Plate Directional Control) Galvanized disc. Im-
portant: See photo to be sure the discs are flipped the proper way.
6.
Put the 4 3/8" washer over the Retainer bushing.
Secure everything in place with the spanner nut or snap ring.
IMPORTANT: Make sure both holes can be exposed after the discs are assembled. If not assem-
bled correctly, the openings will not line up when the gates are supposed to be open.

Assembly

Hopper
8
of the hopper with the 4 carriage head

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssp-400

Table of Contents