Control Units - Furuno FSV-85 Installation Manual

Color scanning sonar
Hide thumbs Also See for FSV-85:
Table of Contents

Advertisement

1.3

Control Units

The control units can be installed in a console (flush mount) or on a desktop (with KB
fixture). Select a location considering the following points.
• Select a location where the controls can be easily operated.
• Locate the unit out of direct sunlight.
• Keep the unit away from water and water splash
• The length of the cable connected between the control unit and IF unit is 5 or 10 m.
Select a location considering the length of the cable.
• Observe the compass safe distance (see the Safety Instructions) to prevent inter-
ference to a magnetic compass.
1.3.1
Control Unit FSV-8501
Desktop installation, with KB fixture
1. Fasten the KB fixture to the selected location with four self-tapping screws
(M520).
2. Connect a ground wire (1.25sq, local supply) between the ground terminal at the
bottom of the unit and ship's ground.
3. Set the unit on top of the KB fixture and fasten the unit with four binding screws
(M512) and wave washers.
4. Set cosmetic caps to fixing holes.
Flush mount
1. Prepare a cutout in the mounting location referring to outline drawing shown be-
low.
2. Make holes for four self-tapping screws (M520).
Set at rear
340±0.5 (13.6")
351±1 (14.0")
1. HOW TO INSTALL THE SYSTEM
KB fixture
Fixing holes
1-9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents