Installing the drop cable and LPU
6
Wrap a layer of PVC tape, starting from 25mm (1 inch) above the outer
jacket and finishing 25mm (1 inch) below the self-amalgamating tape, over
lapping at half width.
Repeat with a further four layers of PVC tape.
7
Start the second layer 25mm (1 inch) above the first layer tape, start the
third layer below the finish of the second layer. Continue until five layers
have been applied, always over lapping at half width.
If a single-hole tag is required at the mast end, modify the two-hole tag as
8
shown.