Installing the ODU
Check that the ODU is pre-fitted with a mounting bracket (designed to ease
installation) and with a ground cable

Figure 5-1 Checking the ODU before mounting

Do not mount the ODU on poles with diameter less than 50mm (2") or greater than
75mm (3"). The ODU mounting bracket is designed to work only with poles with
diameter in the 50 mm (2") to 75 mm (3") range.
Before hoisting the ODU, take the following precautions:
x
Check that the safety loop
and have not been exposed to a shock loading due to a fall.
x
Check that the safety lanyard does not exceed 1m (approx 3 ft) in length.
x
Check that the safety lanyard is made from a material that does not degrade in
an outdoor environment.
x
Check that the safety lanyard is fixed to a separate point that is not part of the
direct mounting system for the ODU.
5-6
(Figure
5-1).
(Figure
5-1) and its fixing are not damaged in any way
Chapter 5 Installation
phn-2182_002v000
May 2011