E N G L I S H
•
The air supply must be disconnected.
•
Remove the complete nose assembly TRM00361 as described in the Proset XT2 instruction manual.
•
Screw Pulling Head (6) together with Jaw Guide Lock (7), Jaw Guide Lock Spring (9) to the tool piston and
then tighten Lock Nut (10) to Pulling Head (6).
•
Attach Jaw Spreader (4) together with Buffer (5) and Jaw Spring (8) to Pulling Head (6).
•
Install Jaw Guide (2) together with Jaws (3) to Pulling Head (6).
•
Screw Nose Casing (1) together with required Nosepiece and O-Ring (11) to Handle Upper.
•
The tool is now ready to place Avseal rivets.
SERVICING INSTRUCTIONS
•
Nose Equipments need to be serviced at weekly intervals or every 3,000 cycles. Hold some stock of all
internal components of Nose Equipment and Nosepieces, they need regular replacement.
•
The air supply must be disconnected.
•
Remove Nose Casing (2), including Nosepiece, and O-Ring (11) from the tool.
•
Pull back Jaw Guide Lock (7) against Jaw Guide Lock Spring (9) and then remove Jaw Guide (2).
•
Remove Jaws (3) from Jaw Guide (2).
•
Remove Jaw Spreader (4), Buffer (5), and Jaw Spring (8), from Pulling Head (6).
•
Rotate Lock Nut (10) anti-clockwise and remove Pulling Head (6), Jaw Guide Lock (7), Jaw Guide Lock
Spring (9) from the tool piston using spanners.
•
Inspect all components. Any worn or damaged parts must be replaced by a new part.
•
Particularly check wear Jaws (3).
•
Clean all parts and apply moly lithium Grease (07992-00020) to Jaws (3) and taper bore of Jaw Guide (2).
•
Assemble according to fitting instructions above.
12