Installing The Front Drum - Wacker Neuson RD 12A Repair Manual

Roller
Hide thumbs Also See for RD 12A:
Table of Contents

Advertisement

RD 12/RD 12A
9.14

Installing the Front Drum

Prerequisites
Crane and appropriate sling
Jacks
Procedure
Follow the procedure below to install the front drum.
1. Slide the drum into position underneath the machine.
2. Apply Loctite 243 to the screws (a) and secure the exciter-motor-side drum support to
the frame. Torque the screws to 79 Nm (58 ft.lbs.).
3. Reconnect the hydraulic lines (b) to the exciter motor. Apply Lotite 243 to the screws
and secure the exciter motor (c) to the drum support.
4. Apply Loctite 243 to the screws and secure the exciter motor (c) to the drum support.
Torque the screws to 44 Nm (32 ft.lbs.).
This procedure continues on the next page.
wc_tx000671gb.fm
Disassembly & Assembly
b
85
a
wc_gr004151
c
wc_gr004152

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rd 1206203690620059062005806203210620320

Table of Contents