Page 1
ESP 7 - Option 2 Desoutter Limited Eaton Road Hemel Hempstead Hertfordshire HP2 7DR England 120 cNm 1.2 Nm OPTION BOARD Part No. 108242-C 30 cNm 60 cNm VIEW ON ARROW A ’ ERVICING AND ANUEL D ENTRETIEN NSTRUÇÕES DE ANUTENÇÃO...
Page 2
YES: means an external signal is required to stop the fastening greater than 3 seconds, all parameter changes are saved, the This instruction to be used in conjunction with the ESP 7 (i.e. The tool is being used to position a fastener/component to parameter change mode is closed and the unit resumes normal Option 1 instructions.
Page 3
External Stop must be disabled before the start of the OUT: CYCLE COMPLETE (OK), same operation as LED on front panel. of status of Green OK "LED" in ESP 7 Programming Description next cycle. Note that signals Reset Last, Reset All and NOK Receipt OUT: NOT COMPLETED (NOK).
Page 4
ESP 7 - Option 2 Programming Description Desoutter Limited Eaton Road Hemel Hempstead Hertfordshire HP2 7DR England Pins of Ext I/O Pin D 25 Pin D type connector as viewed from rear of ESP 7 Controller Pin 21: Input Signal (L See Note).