Section 9
Testing functionality by secondary injection
9.5.1.1
78
phase to phase. Use the set voltages instead of what is indicated
below.
Figure
12
shows the general test connection principle, which can be used during
testing. This description describes the test of the version intended for one bay.
Test
equipment
U-Line
N
IEC05000480 V4 EN-US
Figure 12:
General test connection with three-phase voltage connected to the
line side

Testing the synchronizing function

The voltage inputs used are:
UP3LN1
UL1, UL2 or UL3 line 1 voltage inputs on the IED
UP3BB1
Bus1 voltage input on the IED
Testing the frequency difference
The frequency difference test should verify that operation is achieved when the
frequency difference between bus and line is less than set value of FreqDiffMax
and above set value of FreqDiffMin. The test procedure below will depend on the
settings used. Input STARTSYN must be activated during the test.
FreqDiffMax = 50.2 Hz
FreqDiffMin = 50.01 Hz
IED
U-Bus
U3PBB1
N
Input Phase
L12,L23,L31
U3PLN1
UL1
UL2
Input Phase
UL3
N
L12,L23,L31
IEC05000480-4-en.vsd
1MRK 511 425-UEN A
UMeasure
Ph/N
Ph/Ph
L1,L2,L3
UMeasure
Ph/N
Ph/Ph
L1,L2,L3
Bay control REC650 2.2 IEC
Commissioning manual
M2377-21 v8
M2377-116 v11