Optical Budget Calculation For Serial Communication With Lon - ABB RELION REC650 Commissioning Manual

650 series bay control version 2.2
Hide thumbs Also See for RELION REC650:
Table of Contents

Advertisement

Section 7
Establishing connection and verifying the LON communication
7.2
52
Table 13:
ADE Non group settings (basic)
Name
Values (Range) Unit
Operation
Off
On
TimerClass
Slow
Normal
Fast
LON commands are available on the local HMI under Main menu/Configuration/
Communication/Station communication/Port configuration/SLM optical LON
pot/Service Pin Messae/Generate service pin message
Table 14:
LON commands
Command
Command description
ServPinMess
Command with confirmation. Transfers the node address to the LON Network
Tool.
Optical budget calculation for serial communication
with LON
Table 15:
Example
Maximum attenuation
4 dB/km multi mode: 820 nm - 62.5/125 um
0.3 dB/m plastic: 620 nm - 1mm
Margins for installation, aging, and so on
Losses in connection box, two contacts (0.75 dB/contact)
Losses in connection box, two contacts (1dB/contact)
Margin for repair splices (0.5 dB/splice)
Maximum total attenuation
Step
-
-
-
-
1MRK 511 425-UEN A
Default
Description
Off
Operation
Slow
Timer class
Distance 1 km
Distance10 m
Glass
Plastic
-11 dB
- 7 dB
4 dB
-
-
3 dB
5 dB
2 dB
1.5 dB
-
-
2 dB
0.5 dB
-
11 dB
7 dB
Bay control REC650 2.2 IEC
Commissioning manual
M11737-4 v2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion 650 series

Table of Contents