Installation Material; Table 14: Checklist For Material - ABB FOX615 Installation & User Manual

Table of Contents

Advertisement

C H E C K L I S T S
4.5

Installation material

88
Table 14:
Checklist for material
Description
Screws, washers, crimp lug subrack
- Screws flat head (slot or Phillips) M6
- Screws flat head (slot or Phillips) M6
a
- Washer for 6 mm screws
- Toothed washer for 6 mm screws
- Crimp lug for 6 mm screws for the
a
subrack earthing cable
2
(10 mm
cross section)
Screws FAMO1, FAMO1-F and heat
deflection
- Screws flat head (slot or Phillips) M6
- Screws flat head (slot or Phillips) M6
- Screws flat head (slot or Phillips) M6
Screws ETSI adapters:
- Screws flat head (slot or Phillips) M6
- Screws flat head (slot or Phillips) M6
- Screws flat head (slot or Phillips) M6
Captive nuts (19-inch rack):
- Subrack and cable tray
- FAMO1
- FAMO1-F
- Heat deflection shield R7AI
Cable ties
Latching clips for connectors
- provided with signal cables
- ordered separately for connector
(sets)
Labels for cables
a. Only required if the subrack earthing is done via an earthing cable.
Identifica-
Quantity
tion
Units
4
4
1
a
1
1
4
4
4
4
8
10
8
4
4
4
2
2
Remark
per subrack
per cable tray
per bonding point
per bonding point
per bonding point
per FAMO1
per FAMO-F
per heat deflection
shield R7AI
per pair of ETSI
adapters 2 HE
per pair of ETSI
adapters 9 HE
per pair of ETSI
adapters 11 HE
normally part of the
rack
per signal cable
per standard con-
nector
as required
FOX615
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents