4
Checklists
4.1
Overview
4.2
NE and units
FOX615
Installation
The checklists below help you to prepare equipment and material for installa-
tion. There is a checklist provided for the
•
FOX equipment (NE and units)
•
Cables
•
Material
•
Tools
Table 9:
Checklist FOX equipment
Description
FOX615 package:
- FOX615 subrack
- Front cover subrack
- Cable tray
- -48/-60 VDC power cable
(subrack-to cable tray)
Control unit
Service units:
Please note:
For the contents of the standard packaging, refer to the section
and equipment check
(on page 35) on packaging of the subrack and acces-
sories.
Identification
Quantity (per subrack)
Units
1
1
1
1
CESM1
1 (2)
Type
n
C H E C K L I S T S
Remark
Packed with the subrack
Packed with the subrack
Cable packed with cable
tray
(Unit protection)
Type and number as
required
Unpacking
85