Preparing For Operation - Chauvet Vesuvio II User Manual

Hide thumbs Also See for Vesuvio II:
Table of Contents

Advertisement

S
ETUP

Preparing for Operation

To prepare the Vesuvio II for operation:
1.
Pull out the fluid tank and remove the cap.
2.
Verify that the two plastic hoses attached to the inside of the cap are in place and in good
condition.
3.
Pour Chauvet (QDF) fog fluid inside the tank, and re-cap.
4.
Reinsert the tank.
5.
Make sure that the plastic hose that goes from the cap to the fogger is not bent.
6.
Plug in power and wait approximately 30 seconds for warm-up to complete.
Only use Chauvet approved (QDF) fog fluid. Otherwise, you might not have
satisfactory results. In addition, unapproved fluid can damage the Vesuvio II
by causing the heater element to become clogged, and may also cause
harm to humans or animals. This may void your warranty.
Vesuvio II User Manual Rev. 2
Page 12 of 19

Advertisement

Table of Contents
loading

Table of Contents