5. SETTINGS AND PROCEDURES BEFORE OPERATION
5.1.2
DN91 start-up when setting parameters with the configuration software
Write the parame-
ters onto DN91.
Modify the para-
meters with the
configuration soft-
ware.
Obtain EDS file for the slave station used from the manufacturer
of the station.
Copy the EDS file onto the EDS storage folder of the configuration
software. (If, for example, the software is installed in the folder
"Program Files" of drive C, copy the file onto C:/Program
Files/Hilscher GmbH/SyCon/Fieldbus/DEVNet/EDS.)
Prepare parameters with the configuration software.
Mount DN91 on the base unit, and power ON the unit.
(Set the CPU key switch to STOP, and do not connect the
DeviceNet cable.)
Write the parameters onto DN91.
Power OFF the unit.
Connect the DeviceNet network cable.
Power ON the DeviceNet network and slave stations.
Power ON the unit. (Set the CPU key switch to STOP.)
"Communication
No
(Monitor the buffer memory
Yes
Develop a control sequence program.
Write the control sequence program onto the PLC CPU.
Set the CPU key switch to RUN.
Operates normally?
Start
error code"
area = 0?
to check it.)
No
Yes
Operation
−
5
2
MELSEC-A
Refer to Section 6.4.
Modify the cont-
rol sequence pro-
gram.