Download Print this page
Arris Touchstone OG1600 Installation Manual
Arris Touchstone OG1600 Installation Manual

Arris Touchstone OG1600 Installation Manual

Outdoor gateway

Advertisement

Quick Links

Touchstone® OG1600 Outdoor Gateway

Installation Guide

Safety and Compliance

FCC Compliance

This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of
the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the
equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency
energy and, if not installed and used in accordance with the Installation Manual, may cause harmful interference to
radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which
case the user will be required to correct the interference at his/her own expense.
CAUTION: Any changes or modifications not expressly approved by ARRIS could void the user's authority to operate this
equipment under the rules and regulations of the FCC.
Canadian Compliance
This Class A digital device complies with Canadian ICES-003.
Cet appareil numérique de la classe A est conforme à la norme NMB-003 du Canada.
Housing Instructions
This document contains information about installing the OG1600.

Preparing for Installation

Mounting the Housing
Connecting the Plant Cable Assembly
OG1600 LEDs
(page 4)
CAUTION ARRIS Outdoor Gateways are designed for an operating environment of -10°C to +55°C. The Mil Spec Hdbk 217
states that a 9°C increase in device operating environments will reduce the product's reliability (and projected lifetime)
by 50%. Therefore, you should take proper care to maximize airflow around the Outdoor Gateway and to minimize
ambient temperatures.
Preparing for Installation
To prepare the OG1600 housing for installation
The OG1600 Outdoor Gateway is delivered without the strand mount assembly attached to the housing base.
1. Inspect the shipping carton and ensure that the strand mount assembly is present.
a. The strand mount assembly is available from ARRIS and consists of:
Two offset brackets
Two strand clamps
Two 1/4" x 1.25" length bolts
Contact ARRIS if you need to order a strand mount assembly.
2. Inspect the outside of the housing. Check the convection fins,coaxial cable entry ports, captive lid bolts, and all
service entry points for damage.
Release 16 STANDARD 1.0 August 2016
(page 1)
(page 2)
(page 3)
© 2016 ARRIS Enterprises LLC. All Rights Reserved.
1

Advertisement

loading

Summary of Contents for Arris Touchstone OG1600

  • Page 1: Installation Guide

    OG1600 LEDs (page 4) CAUTION ARRIS Outdoor Gateways are designed for an operating environment of -10°C to +55°C. The Mil Spec Hdbk 217 states that a 9°C increase in device operating environments will reduce the product’s reliability (and projected lifetime) by 50%.
  • Page 2: Mounting The Housing

    3. Loosely attach the strand clamps to the strand mount assemblies using the 1/4” x 1.25” length bolts included with the strand mount assembly, as shown in the following figure. Figure 2: Attaching strand clamps to strand mount brackets Release 16 STANDARD 1.0 August 2016 © 2016 ARRIS Enterprises LLC. All Rights Reserved.
  • Page 3: Connecting The Plant Cable Assembly

    Important: The OG1600 is designed to be mounted near the cable plant tap in order to minimize the length of coaxial cable needed to connect. Extended lengths of coaxial cable can reduce the DOCSIS receive sensitivity of the Outdoor Gateway. Release 16 STANDARD 1.0 August 2016 © 2016 ARRIS Enterprises LLC. All Rights Reserved.
  • Page 4 2. 2.4GHz: indicates the status of the 2.4 GHz wireless LAN. 3. 5GHz: indicates the status of the 5 GHz wireless LAN. 4. Online: indicates internet data transmission status. 5. US/DS: indicates upstream/downstream connectivity. Release 16 STANDARD 1.0 August 2016 © 2016 ARRIS Enterprises LLC. All Rights Reserved.
  • Page 5 Fast Flash (3 / Second) = Upstream is done acquisition in progress On (Upstream acquisition complete) Slow Flash (during initialization / IP acquisition) On (when modem obtain IP address) Release 16 STANDARD 1.0 August 2016 © 2016 ARRIS Enterprises LLC. All Rights Reserved.