Green Tube Connection; Reverse Osmosis Module Mounting; Tank Ball Valve Installation; Blue Tube Connection (From The Storage Tank To Shut Off Valve) - Watts Premier RO-PURE Plus Installation, Operation And Maintenance Manual

Water supply
Table of Contents

Advertisement

Green Tube Connection

Locate green tube attached to the RO Module. Insert the open
Step 15
end of the green 1/4" tube into the open 1/4" quick connect fitting
on the plastic water feed valve making sure the tube is pushed in
all the way to the tube stop.

Reverse Osmosis Module Mounting

Determine best location for the RO module to be mounted to allow
Step 16
for future system maintenance. The parts bag has 2 self tapping
screws. Using an electric drill with a Phillips bit, screw them into
the cabinet wall 6" apart and 16" from the bottom of the cabinet.
Note:
Do not cut any RO system tubes at this time

Tank Ball Valve Installation

Step 17
Teflon tape must be applied in a clockwise direction. Wrap
(7 to 12 turns) around the male pipe threads (MPT) on the
stainless steel fitting on top of the tank.
Thread the quick connect ball valve (supplied in the parts bag)
Step 18
onto the stainless steel connector on the tank.
Note: Do not over-tighten plastic connections.
Blue Tube Connection (From The Tank to Shut off Valve)
Position tank in desired location. Stand it upright or lay it on
Step 19
its side (using the black plastic stand). Measure the blue tube
(marked "TANK") from the RO module to the tank and cut it to
length leaving a straight, square edge. Insert the tube into the
quick connect fitting on the tank ball valve. Make sure the tube
is pushed in all the way to the tube stop (see page 7 for quick
connect fitting use directions).
Note: Set the blue ball valve knob in-line with the blue tube, this is the "open" position.
Page 11
Green Tube
Adapt-a-Valve

Advertisement

Table of Contents
loading

Table of Contents