Power Supply Activation, Lead Time - ABB SCC-C Operator's Manual

Sample gas cooler
Table of Contents

Advertisement

Electrical Line Connection,
Connecting the
Power Supply

Power Supply Activation, Lead Time

Power Supply
Activation
Lead Time
Status Signal
Readiness
Sample Gas Supply
42/23-55 EN Rev. 1
continued
Step
Action
1
Make sure the voltage shown on the rating plate matches the
line voltage.
The operating voltage cannot be switched over.
2
Make sure the power supply leads have an adequately dimensioned
protective device (breaker).
3
Install a switched outlet or a breaker in the power supply wiring near
the sample gas cooler. This should allow the sample gas cooler and
all switches to be completely disconnected from the power supply if
necessary. The disconnection device should be identified in such a
way that its relationship to the equipment that it is designed to
disconnect can be clearly seen.
4
Connect the power supply wiring to the power supply.
The sample gas cooler may start when the power supply is
connected.
WARNING!
Before activating the power supply check once again that the operating
voltage setting matches the line voltage (see rating plate)
The sample gas flow should only be started after the lead time period.
Activate the power supply using the externally installed breaker or the switched
outlet.
The peristaltic pumps start to run (counterclockwise).
The lead time is approx. 15 minutes. This allows the sample gas outlet tempera-
ture of +3 °C, which is set in the factory, to be reached.
During the lead time the monitor will output the temperature alarm signal.
At the end of the lead time period the sample gas cooler is ready for operation.
The sample gas must not be switched on until the sample gas outlet temperature
lies within the limit values set in the factory, i.e. when it has fallen below +6 °C.
SCC-C Sample Gas Cooler Operator's Manual
13