Sample Gas Cooler Packing - ABB SCC-C Operator's Manual

Sample gas cooler
Table of Contents

Advertisement

Sample Gas Cooler Packing

Activate Compressor's
Transportation
Restraints
Packing
Ambient Temperature Ambient temperature for storage and transportation: –25 to +60 °C
42/23-55 EN Rev. 1
Step
Action
1
Using a Ph2 cross-head screwdriver, turn the two screws counter-
clockwise through the holes in the base plate to the point at which the
compressor housing is in contact with the base plate (noticeable
resistance).
Step
Action
1
If the original packaging is not available, cover the sample gas cooler
with bubble paper or corrugated cardboard.
2
Place the sample gas cooler in an adequately sized box lined with
shock-absorbing material (e.g. foam).
The cushioning material's thickness should be adequate for the
sample gas cooler's weight and the mode of shipping.
3
Mark the box "Fragile Item" and "Transport Upright".
Additional steps when shipping overseas:
4
Add a drying agent (e.g. silica gel) and wrap the sample gas cooler
air-tight in an additional 0.2-mm thick polyethylene sheet.
The amount of drying agent used should be adequate for the
package volume and the planned shipping time (at least
3 months).
5
The box should also be lined with a double layer of bitumen paper.
SCC-C Sample Gas Cooler Operator's Manual
23

Advertisement

Table of Contents
loading

Table of Contents