Installing The Ap; Preparing For Installation; Precautions; Preparing Tools - Tenda i12 User Manual

Table of Contents

Advertisement

2

Installing the AP

2.1

Preparing for Installation

Before installing the AP, follow the instructions in this section to make preparation.
2.1.1

Precautions

To prevent damaging the AP or causing a personal injury, pay attention to the following precautions:
Ensure that the temperature and humidity requirements specified in the following table are met.
Environment
Operating
environment
Storage environment
Ensure that the AP is mounted on a place free of accumulated water and water drips. Do not install the
AP in a wet environment.
Do not open or remove the housing of the AP.
Keep the AP clean.
Before cleaning the AP, disconnect it from the power supply. Do not scrub the AP with any liquid.
2.1.2

Preparing Tools

You may need a rubber hammer, a marker, a hammer drill, a spirit level, a measuring tape, a 6 mm drill bit, a
Phillips screwdriver, ESD gloves, and a ladder during installation. Prepare them yourself.
Rubber hammer
Spirit level
Phillips screwdriver
2.2
Installing the AP
Step 1
Place the mounting bracket onto the target position of the ceiling and mark the positions of the screw
Temperature
0°C - 45°C
-40°C - 70°C
Marker
Measuring tape
ESD gloves
Humidity
10%RH - 90%RH (non-condensing)
5%RH - 90%RH (non-condensing)
Hammer drill
6 mm drill bit
Ladder

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents