Disassembly Procedure - Mitsubishi Electric PFFY-P20VKM-E Service Manual

Series pffy floor standing
Hide thumbs Also See for PFFY-P20VKM-E:
Table of Contents

Advertisement

10

DISASSEMBLY PROCEDURE

PFFY-P20VKM-E
OPERATING PROCEDURE
1. Removing the panel
(1) Push both sides of the upper part of the front grille and
pull the front grille open, and then remove the front grille
from the panel. (See Photo 1.)
(2) Remove the screws of the panel. (See Photo 2.)
(3) Open the horizontal vane and push the left, right and
middle of the upper part of the panel, and pull the panel
toward you. (See Photo 2.)
(4) Lift up the panel and remove it from the box.
PFFY-P25VKM-E
PFFY-P32VKM-E
Photo 1
Push
Grille
Photo 2
Push
23
PFFY-P40VKM-E
PHOTOS
Horizontal
vane
Screws of the panel
Push
Push
Push

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pffy-p25vkm-ePffy-p32vkm-ePffy-p40vkm-e

Table of Contents