Check List - Potterton Performa 24 User Manual

Wall mounted combination boiler gas fired central heating unit.
Table of Contents

Advertisement

5mm Min
Fig. 15
450mm Min
For Servicing
Purposes
8mm Min
In Operation
Fig. 16
8
450mm
2
Reset
Burner On
Flame Failure
Power On
bar
5mm Min
Clearances around the Boiler (Figs. 15 & 16)
1. The minimum clear spaces needed around the
boiler measured from the casing are as follows:
200mm Min
Top
Bottom
Both sides -
Front
2. These areas must not be obstructed in any way.
Blocking the clearance spaces may result in the
boiler overheating and damage may occur.
3. The gas burning compartment of your boiler is
780mm
completely sealed from the room in which it is fitted.
Products from the combustion of gas are vented to the
outside through the flue terminal which must be kept
free from obstruction as this would interfere with the
correct operation of the boiler.
4. The boiler may be installed in a cupboard if these
minimum clearances are kept. The compartment
should be large enough to house the boiler and
ancillary equipment only.
5. IT SHOULD NOT BE USED AS A STORAGE
200mm Min
CUPBOARD.

Check List

1. If a fault develops, or is suspected, call your
Installer or Service Engineer as soon as possible.
2. Go through the following check list before you make
contact.
a)
Is the electricity supply on ?
b)
Is the selector switch on (giving a green
"Power ON" light) and set for both Central Heating
and Domestic Hot Water ?
c)
Is a fault suggested by the neon indicators ?
d)
Is the gas supply on ?
e)
Is the mains water supply turned on ?
f)
Is the system pressure correct ?
g)
Are the boiler temperature controls set high
enough ?
h)
Is the time clock (if fitted) calling for central
heating ?
i)
Is the room thermostat (if fitted) set high
enough ?
j)
Are the radiator valves open ?
-
200mm
-
200mm
5mm
-
5mm
(In Operation)
-
450mm
(For Servicing)
© Baxi Heating UK Ltd 2007

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents