Check Tightness; Venting The Gas Line; Air Supply/Flue Gas Outlet Connections; Flue Gas Connection - Potterton Eurocondense five 125 kW Installation Manual

Gas condensing boiler
Table of Contents

Advertisement

6.5

Air supply/flue gas outlet connections

7703301 - 01 - 16072018
6.4.2

Check tightness

Danger
Danger! Danger to life by gas!
The entire gas inlet pipe, particularly the joints, must be checked
for leakages before commissioning.
The gas burner valve on the gas burner must be pressure- tested
at maximum of only 100mbar
6.4.3

Venting the gas line

The gas line must be vented before initial commissioning.
For this, open the measuring nozzle for the connecting pressure and vent,
taking the safety precautions into account. Check for tightness of the
connection after venting.
Danger
Danger to life by gas!
The entire gas pipe, particularly the joints must be checked for
leakages before commissioning.
6.5.1

Flue gas connection

For the operation of the EC five as a gas condensing boiler, the flue gas
pipe should be designed with the flue gas temperature under 120°C (flue
gas pipe type B). The flue gas piping system SAS approved in
conformance with building regulations is intended for this purpose.
Compilation of the necessary basic construction kits
RLA:
RLUA:
RLUA with wall connec­
tion:
Important
Connecting the boiler as RLUA-version (RLUA-set and possibly
WAS) may give rise to reduced output of the boiler, which is
compensated by Potterton customer service.
Approval number
The SAS has been approved by the Deutsche Institut für Bautechnik
(DIBt) (German Institute for Civil Engineering) in general conformance with
building regulations:
Approval Number Z-7.2.-1104
SAS 160-2/SAS 160-4/SAS 200
SAS 160-2/SAS 160-4/SAS 200 + RLUA
SAS 160-2/SAS 160-4/SAS 200 + RLUA +
WAS
6 Installation
41

Advertisement

Table of Contents
loading

Table of Contents