Power Down The Server; Extend The Server From The Rack - HP ProLiant DL580 Gen9 Maintenance And Service Manual

Table of Contents

Advertisement

Remove the access panel (on page 28).
If you are servicing internal components, remove the access panel.
Remove the processor memory drawer shipping screws
locations" on page 29).
Remove the processor memory drawer (on page 29).
Remove the processor memory drawer cover (on page 30).
Remove the SPI board (on page 30).

Power down the server

WARNING: To reduce the risk of personal injury, electric shock, or damage to the equipment,
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some
internal circuitry remain active until AC power is removed.
IMPORTANT: If installing a hot-plug device, it is not necessary to power down the server.
Back up the server data.
1.
Shut down the operating system. For more information, see the operating system documentation.
2.
NOTE: If the operating system automatically places the server in Standby mode, omit the
next step.
Press the Power On/Standby button to place the server in Standby mode. When the server activates
3.
Standby power mode, the system power LED changes to amber.
IMPORTANT: Pressing the UID button illuminates the blue UID LEDs on the front and rear
panels. In a rack environment, this feature facilitates locating a server when moving between
the front and rear of the rack.
Disconnect the power cords.
4.
The system is now without power.

Extend the server from the rack

WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack
is adequately stabilized before extending a component from the rack.
WARNING: To reduce the risk of personal injury, be careful when pressing the server
rail-release latches and sliding the server into the rack. The sliding rails could pinch your
fingers.
To extend the server from the rack:
Pull down the quick-release levers on each side of the server to release the server from the rack. If
1.
necessary, loosen the rack screws.
("Processor memory drawer shipping screw
Removal and replacement procedures 26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents