Establishing The Configuration Task; Enabling The Master/Slave Switchover; Performing Master/Slave Switchover - Huawei S9300 Configuration Manual

Table of Contents

Advertisement

3 Hardware Management

3.9.1 Establishing the Configuration Task

3.9.2 Enabling the Master/Slave Switchover

3.9.3 Performing Master/Slave Switchover

3.9.4 Checking the Configuration
3.9.1 Establishing the Configuration Task
Applicable Environment
When double main control boards are installed on the S9300, you can configure forcible master/
slave switchover through command lines.
Pre-configuration Tasks
None.
Data Preparation
None
3.9.2 Enabling the Master/Slave Switchover
Context
Do as follows on the S9300 that needs to be enabled with master/slave switchover:
Procedure
Step 1 Run:
system-view
The system view is displayed.
Step 2 Run:
slave switchover enable
Master/slave switchover is enabled.
By default, master/slave switchover is enabled.
----End
3.9.3 Performing Master/Slave Switchover
Context
Before performing master/slave switchover, make sure that the master and slave main control
boards run normally and meet the requirements for switchover.
If the S9300 is in any of the following situations, do not perform master/slave switchover:
3-10
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Quidway S9300 Terabit Routing Switch
Configuration Guide - Device Management
Issue 02 (2009-08-06)

Advertisement

Table of Contents
loading

Table of Contents