Inner-Rail Release Clip - Cisco UCS C240 M5 Installation And Service Manual

Table of Contents

Advertisement

Installing the Server in a Rack
b) Push the inner rails into the slide rails on the rack until they stop at the internal stops.
c) Slide the inner-rail release clip toward the rear on both inner rails, and then continue pushing the server into the rack
until its front slam-latches engage with the rack posts.
Figure 8: Inner-Rail Release Clip
1

Inner-rail release clip

2
Inner rail attached to server and inserted into outer
slide rail
Step 5
(Optional) Secure the server in the rack more permanently by using the two screws that are provided with the slide rails.
Perform this step if you plan to move the rack with servers installed.
With the server fully pushed into the slide rails, open a hinged slam latch lever on the front of the server and insert a
screw through the hole that is under the lever. The screw threads into the static part of the rail on the rack post and
prevents the server from being pulled out. Repeat for the opposite slam latch.
Cisco UCS C240 M5 Server Installation and Service Guide
18
3
Outer slide rail attached to rack post
-
Installing the Server

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents