Example Of Installation On The Floor Mat Or On The Chassis; Replacing The Terminal Cover; Changing The Direction Of The Badge - Pioneer PRS-A900 Owner's Manual

Bridgeable four-channel power amplifier
Hide thumbs Also See for PRS-A900:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
Installation
Example of installation on the floor
mat or on the chassis
1. Place the amplifier where it is to be
installed. Insert the supplied tap-
ping screws (4 mm × 18 mm) into
the screw holes. Push on the screws
with a screwdriver so they make
marks where the installation holes
are to be located.
2. Drill 2.5 mm diameter holes at the
point marked, and install the ampli-
fier, either on the carpet or directly
to the chassis.
Tapping screw
(4 mm × 18 mm)
Floor mat or chassis
13
Drill a 2.5 mm
diameter hole

Replacing the terminal cover

1. Align the unit and terminal cover,
and insert the screw.
2. Tighten the screw with a 4 mm
hexagonal wrench.
Screw
Terminal Cover

Changing the Direction of the Badge

1. To remove the badge, loose screws
by using a 2 mm hexagonal wrench.
2. Change the direction of badge, and
then tighten the screws with a
hexagonal wrench.
Screw
Badge

Advertisement

Table of Contents
loading

Table of Contents