Start-Up, Calibration And Operation Of The Burner; Notes On Safety For The First Start-Up; Adjustment Before First Firing (Gas Oil Operation); Combustion Head Setting - Riello RLS 100 Installation, Use And Maintenance Instructions

Dual fuel gas oil/ gas burners
Table of Contents

Advertisement

7

Start-up, calibration and operation of the burner

7.1

Notes on safety for the first start-up

The first start-up of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
7.2

Adjustment before first firing (gas oil operation)

7.2.1

Combustion head setting

The setting of the combustion head depends exclusively on the
delivery of the burner in the 2
Turn screw 5)(Fig. 29) until the notch shown in diagram (Fig. 30)
is level with the front surface of flange 6).
Example burner RLS 100:
nd
2
stage burner delivery = 72 kg/h.
If diagram (Fig. 30) is consulted it is clear that for this delivery, the
combustion head must be adjusted using notch 3, as shown in
Fig. 29.
7.2.2

Pump adjustment

No settings are required for the pump, which is set to 12 bar by
the manufacturer.
This pressure must be checked and adjusted (if required) after
the burner has been ignited.
The only operation required in this phase is the application of a
pressure gauge on the appropriate pump attachment.
7.2.3

Fan gate adjustment

The first time the burner is fired leave the factory setting un-
st
changed for both 1
stage and 2
7.3

Burner calibration (gas oil operation)

It is advisable to first set the burner for operating
on oil and then for gas.
Execute the fuel exchange when the burner is off.
WARNING
7.3.1

Firing

Set switch 1)(Fig. 31) to "ON".
During the first firing, during the passage from the 1
stage, there is a momentary lowering of the fuel pressure caused
nd
by the filling of the 2
stage nozzle tubing.
This lowering of the fuel pressure can cause the burner to lock-
out and can sometimes give rise to pulsations.
Start-up, calibration and operation of the burner
nd
stage.
nd
stage operation.
st
to the 2
Check the correct working of the adjustment, com-
mand and safety devices.
WARNING
Notches no.
nd
2
Burner
Off
On
nd
7.3.2

Operation

The optimum calibration of the burner requires an analysis of the
flue gases at the boiler outlet and interventions on the following
points.
st
nd
1
and 2
stage nozzles
See the information listed on page 17.
27
GB
stage fuel delivery kg/h
1
2
Stage
1
2
D469
D1149
Fig. 29