Indicator Housing - Excell PCH3 User Manual

Waterproof counting indicator
Table of Contents

Advertisement

EXCELL PRECISION CO., LTD.

Indicator Housing

Before opening the stainless steel indicator housing, make sure it is dry. If
necessary wipe the housing dry paying particular attention to the joint between the
front panel and rear housing.
The re-assembly instructions should be accurately followed to ensure the IP rating
is maintained in service.

There are no user serviceable parts inside the indicator and all service work
should be carried out by the technical staff of your supplier.
Re-assembly Instructions
Position the front panel onto the rear housing and fit all six fixing screws finger
tight. Tighten the screws in the order shown in the diagram below to a torque of
12 kgf-cm.

Over tightening the screws could impair the IP rating.
Tightening order:
3rd
1st
6th
5th
4th
2nd
03004035
3
ZSME200000058

Advertisement

Table of Contents
loading

Table of Contents