The name of the project. See also item
Operator: The name of the person who will do the tests for the
project.
The date range for the results in the project.
Results: A summary of the test results in the project:
: The number of tests that failed.
: The number of tests that passed.
: The number of results that have measurements within the
range of accuracy uncertainty for the tester. See "PASS*/FAIL*
Results" on page 40.
riešenia na presné meranie
G
Figure 24. PROJECT Screen
H
I
.
Chapter 4: Projects
The PROJECT Screen
J
J
GPU08.EPS