Belt Switch; Belt Switch Removal - GE GFDR485GF Technical Service Manual

Louisville built front load dryers
Hide thumbs Also See for GFDR485GF:
Table of Contents

Advertisement

See Trap Duct Removal on page 38.
5. Remove the drum lamp.
See LED Drum Lamp Removal on page 33.
See Incandescent Drum Lamp Removal on
page 34.
6. Remove the front drum support.
See Front Drum Support Removal on page 34.
7. Remove the belt.
8. Pull the drum out the front of the dryer.
9. Remove the inlet ring.
See Inlet Ring Removal on page 39.
10. Remove the 14 mm reverse thread blower wheel
back-up nut.
11. Unscrew the reverse thread blower wheel.
12. Unhook the idler pulley spring and spread the
pulley apart.
13. Remove the motor wire harness.
14. Remove the two motor mounting clips.
15. Remove the motor.

Belt Switch

Belt Switch Removal

1. Disconnect power from the unit.
2. Remove the control panel.
See Control Panel Removal on page 20.
3. Remove the front panel.
See Front Panel Removal on page 24.
4. Remove the trap duct.
See Trap Duct Removal on page 38.
5. Remove the drum lamp.
See LED Drum Lamp Removal on page 33.
See Incandescent Drum Lamp Removal on
page 34.
6. Remove the front drum support.
See Front Drum Support Removal on page 34.
7. Remove the belt.
8. Pull the drum out from the front of the dryer.
9. Remove the two idler switch wires.
10. Remove the T-8 mounting screw.
11. Remove the belt switch.
12. NOTE: When reinstalling, make sure the align-
ment pin is in the second hole of the belt switch.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents