Door Seal; Door Seal Removal; Door Frame; Door Frame Removal - GE GFDR485GF Technical Service Manual

Louisville built front load dryers
Hide thumbs Also See for GFDR485GF:
Table of Contents

Advertisement

Door Seal

Door Seal Removal

The door seal is held in place by tabs on the back
side of the seal. Pull the seal tabs out of the door
frame to remove.

Door Frame

See Door Frame Location on page 28.

Door Frame Removal

1. Remove the door.
See Door Removal on page 28.
2.
the door frame facing upward.
3. Remove the ten #2 Phillips from the perimeter of
the door frame.
NOTE
used on the door frame. If the shorter screws are re-
moved, the screws must be put back in their proper
positions to avoid damaging the door assembly.
Long
Short
Short
Long
Short
Long
Long
4. Grasp the hinge and lift the door frame to re-
move.

Door Hinge

Bushing
Bushing
Holding Screw
Hinge
See Door Hinge Location on page 28.
The door hinge is attached to the front panel by two
T-25 screws. In addition to these two screws, there
is another screw that holds the door hinge in place
when the T-25 screws are removed. This screw can
be installed in either the "W" or "D" position. "D" is
used for right swinging doors and "W" is used for left
swinging doors.
The door assembly pivots on four bushings (shown
above). The hinge bushings are sandwiched be-
tween the hinge bracket and hinge plate as shown
on the next page.
30
Long Long
Long
Short
Long
Short
Short
Long
Long
Bushing
Bushing

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents