Foundation box - Installation
- Dig a hole as per the measurements shown in fig.2. Foresee an
additional space for the pipes of water drainage and electric cables.
- Place the foundation box inside the hole so that the pin welded to
the box is aligned with the upper hinge of the gate (fig.3 and fig.4).
- Insert the two pipes
on the box. Connect the pipes to a good canal of the rain
dispersion.
- Connect the tube of the electric cables into the special hole fitted on
the box, on the side of the wing opening.
- Cast the concrete inside the hole, making sure the box is level. It
must be 5 mm higher than the finished floor (cover thickness).
- Wait for the concrete has solidified.
Fig.3
of water drainage
-4 -
into the special holes fitted
Wing
Pillar
Fig.4