Led Indicators - D-Link DGS-1100-05 User Manual

Smart managed
Hide thumbs Also See for DGS-1100-05:
Table of Contents

Advertisement

1 Product Introduction

LED Indicators

The Switches feature LED indicators for Power and Link/Act for each port. The following shows the LED
indicators for the DGS-1100-05/05PD/08/08PD switches along with an explanation of each indicator.
Location
Indicator LED
Power
Per Device
PoE Max.
(Only DGS-1100-
08P)
LED Per
10/100/1000
Link/Act/Speed
Mbps Port
LED Per PoE Port PoE Status
LED Per PD Port
(DGS-1100-05PD
PD Status
only)
NOTE: The power budget is 64 Watts for DGS-1100-08P.
Figure 1.9 –LED Indicators on DGS-1100 series
Color
Green
Red
Green/Amber
Green/Amber
Green/Amber
D-Link Smart Managed Switch User Manual
Status
Description
Solid Light
The device is powered on.
PoE Pass Through Off (DGS-1100-
Blinking
05PD only)
Light off
The device is powered off.
When the power output to PDs is over
Solid Light
57W. No additional PDs can be
powered for safety consideration.
If the user unplugged certain PDs and
made the PoE power budget left over
Blinking
7W, the PoE MAX LED will blink 5
seconds.
When the power budget is using less
Light off
the 57W.
Indicates there is a 1000 Mbps
Solid Green
connection on this port.
Blinking
Indicates data is being processed on
Green
this port at 1000 Mbps.
Indicates there is a 10/100 Mbps
Solid Amber
connection on this port.
Blinking
Indicates data is being processed on
Amber
this port at 10/100 Mbps.
Indicates there is no active link on this
Light off
port.
Solid Green PD device insert and power feeding.
PD device insert but failure occurs.
(PSE can't provide power to PD due to
Solid Amber
PD error or power budget is not
enough.)
Light off
No PD device inserts.
Solid Green Receiving power from PSE per 802.3at
Solid Amber Receiving power from PSE per PSE.
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1100-08Dgs-1100-05pdDgs-1100-08p

Table of Contents