HARDWARE INSTALLATION GUIDE
Brocade 6505
Hardware Installation Guide
53-1002449-09
30 May 2016

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 6505 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Brocade Communications Systems 6505

  • Page 1 HARDWARE INSTALLATION GUIDE Brocade 6505 Hardware Installation Guide 53-1002449-09 30 May 2016...
  • Page 2 United States government. The authors and Brocade Communications Systems, Inc. assume no liability or responsibility to any person or entity with respect to the accuracy of this document or any loss, cost, liability, or damages arising from the information contained herein or the computer programs that accompany it.
  • Page 3: Table Of Contents

    What’s new in this document..............................................11 Device Overview....................................................13 Brocade 6505 overview................................................. 13 Platform features................................................13 Platform components..............................................14 Facility requirements..................................................15 Port side of the Brocade 6505............................................15 Nonport side of the Brocade 6505..........................................16 Brocade 6505 management..............................................17 Preparing for Installation..................................................19 Installation precautions................................................19 ESD precautions..................................................19 Power precautions..................................................
  • Page 4 Fabric OS Native and Access Gateway modes....................................... 54 Access Gateway default port mapping....................................... 55 Disabling and enabling Access Gateway mode.....................................55 Monitoring the Device..................................................57 Powering the Brocade 6505 on and off........................................57 LED activity interpretation..............................................57 Brocade 6505 LEDs..............................................57 LED locations..................................................58 LED patterns..................................................
  • Page 5 Time and items required..............................................67 Removing a power supply and fan assembly....................................67 Replacing a power supply and fan assembly....................................68 Adding a second power supply and fan assembly in a Brocade 6505.............................69 Time and items required............................................. 69 Installing a second power supply and fan assembly...................................69 Brocade 6505 Switch Technical Specifications........................................71...
  • Page 6 Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 7: Preface

    In Fibre Channel products, square brackets may be used instead for this purpose. x | y A vertical bar separates mutually exclusive elements. < > Nonprinting characters, for example, passwords, are enclosed in angle brackets. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 8: Notes, Cautions, And Warnings

    For product support information and the latest information on contacting the Technical Assistance Center, go to http:// www.brocade.com/services-support/index.html. If you have purchased Brocade product support directly from Brocade, use one of the following methods to contact the Brocade Technical Assistance Center 24x7. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 9: Brocade Oem Customers

    By sending your feedback to documentation@brocade.com. Provide the publication title, part number, and as much detail as possible, including the topic heading and page number if applicable, as well as your suggestions for improvement. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 10 Preface Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 11: About This Document

    ∙ What’s new in this document......................................11 Supported hardware and software This document includes information specific to the Brocade 6505 running Brocade Fabric OS version 7.1.0. and later. What’s new in this document The following changes have been made: ∙...
  • Page 12 About This Document Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 13: Device Overview

    Fibre Channel Storage Area Networks (SANs). The Brocade 6505 is a small-to-midsize business-class switch that is designed to handle smaller-scale SAN requirements. The Brocade 6505 provides up to 24 ports in a single height (1U) switch that enables the creation of very dense fabrics in a relatively small space.
  • Page 14: Platform Components

    Two Ethernet port LEDs (integrated with RJ45) for speed and port activity. (A green LED for port speed and an amber LED for port activity.) ∙ SEEPROM for switch identification. ∙ Voltage monitor. ∙ Fan monitor. ∙ Temperature monitor. ∙ Real-time clock (RTC) with battery. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 15: Facility Requirements

    Port side of the Brocade 6505 The port side of the Brocade 6505 includes the system status LED, the console port, the Ethernet port and accompanying LEDs, the USB port, and the Fibre Channel ports and corresponding port status LEDs.
  • Page 16: Nonport Side Of The Brocade 6505

    Nonport side of the Brocade 6505 The following figure shows the non-port side of the Brocade 6505, which contains the power supply (including the AC power receptacle and AC power switch) and fan assemblies. The base model configuration with a single assembly is shown.
  • Page 17: Brocade 6505 Management

    Handle Brocade 6505 management You can use the management functions built into the Brocade 6505 to monitor the fabric topology, port status, physical status, and other information to help you analyze switch performance and to accelerate system debugging. The Brocade 6505 automatically performs power-on self-test (POST) each time it is turned on. Any errors are recorded in the system error log.
  • Page 18 Device Overview Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 19: Preparing For Installation

    Static electricity can damage the chassis and other electronic devices. To avoid damage, keep static-sensitive devices in their static-protective packages until you are ready to install them. Wear a wrist grounding strap connected to chassis ground (if the Brocade 6505 is plugged in) or a bench ground. DANGER For safety reasons, the ESD wrist strap should contain a series 1 megaohm resistor.
  • Page 20: Rtc Battery

    A maximum of 102 cubic meters/hour (60 cubic feet/minute) and a minimum of 74.8 cubic meters/hour (44 cubic feet/ minute) of air flow is available for air intake. CAUTION Make sure the airflow around the front, sides, and back of the device is not restricted. ∙ Ensure temperature requirements are met. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 21: Items Included With The Brocade 6505

    Items included with the Brocade 6505 The following items are included with the standard shipment of a fully-configured Brocade 6505. When you open the Brocade 6505 packaging, verify that these items are included in the package and that no damage has occurred during shipping: ∙...
  • Page 22 Preparing for Installation Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 23: Mounting The Device

    ∙ The two rack kit options for the Brocade 6505 use rails that are slimmer than standard rails to accommodate the slightly wider chassis. Be sure to use one of these kits. Do not use standard rails to install the in a rack; they will not fit with the switch.
  • Page 24: Installing The 1U, 1.5U, And 2U Mid-Mount Kit For Two-Post Racks (Xbr-000165, Xbr-000175, And Xbr-R000292)

    The following parts are provided with the 1U, 1.5U, and 2U Mid-Mount Rack Kit for Two-Post Racks (XBR-000165, XBR-000175, and XBR-R000292). NOTE Not all parts may be used with certain installations depending on the device type. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 25 Bracket, front right and back left Bracket, front left and back right Screw, 8-32 x 5/16-in., panhead Phillips (12) Screw, 6-32 x 1/4-in., flathead Phillips (8) Screw, 10-32 x 5/8-in., panhead Phillips (8) Retainer nut, 10-32 (8) Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 26: Attaching The Front Brackets To The Device

    Make sure that the airflow for all devices moves in the same direction to maximize cooling. Refer to the Hardware Installation Guide for your product for specific requirements. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 27: Attaching The Device To A Rack

    Attaching the rear brackets to the rack NOTE Do not use the rear brackets for the Brocade 6505, 6510, or 6520 switches. Complete the following steps to attach the rear brackets to the rack. Position the right rear bracket in the right rear of the device as shown in the following figure.
  • Page 28: Attaching The Rear Brackets To The Device

    Align the left rear bracket to the left rear of the device and use two 8-32 x 5/16-in. screws to attach the bracket to the device as shown in the following figure. Tighten all the screws to a torque of 9 in-lbs (10 cm-kgs). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 29: Installing The 1U And 2U Flush-Mount Rack Kit For Two-Post Racks (Xbr-000307 And Xbr-R000293)

    The following items are required to install a device using the 1U and 2U Flush-Mount Rack Kit for Two-Post Racks (XBR-000307 and XBR-R000293). ∙ Phillips #2 torque screwdriver ∙ 1/4-inch slotted blade torque screwdriver Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 30: Parts List

    Use the screws specified in the procedure. Using longer screws can damage the device. Parts list The following parts are provided with the 1U and 2U Flush-Mount Rack Kit for Two-Post Racks (XBR-000307 and XBR-R000293): Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 31 Not all parts may be used with certain installations depending on the device type. NOTE Although this document describes how to install both single height (1U) and double height (2U) devices, the illustrations show a 2U device as a typical installation. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 32: Attaching The Front Brackets To The Device

    Repeat step 1 through step 3 to attach the left front bracket to the left side of the device. Tighten all 8-32 x 5/16-in. screws to a torque of 15 in-lbs. (17 cm-kgs). FIGURE 10 Attaching the front brackets 1 Front brackets, right and left 3 Screw, 8-32 x 5/16-in., panhead Phillips Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 33: Attaching The Front Brackets To The Rack

    Attach the left front bracket to the left rack upright using three 10-32 x 5/8-in. screws and three retainer nuts. Tighten all the 10-32 x 5/8-in. screws to a torque of 25 in-lbs. (29 cm-kgs). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 34: Attaching The Rear Brackets To The Rack

    Attach the brackets to the right rack upright using three 10-32 x 5/8-in. screws and retainer nuts. Repeat step 1 and step 2 to attach the left rear bracket to the left rack upright. Tighten all the 10-32 x 5/8-in. screws to a torque of 25 in-lbs. (29 cm-kgs). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 35: Attaching The Rear Brackets To The Device

    Align the left rear bracket to the left rear of the device and using two 8-32 x 5/16-in. screws, attach the bracket to the device. Tighten all the 8-32 x 5/16-in. screws to a torque of 15 in-lbs. (17 cm-kgs). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 36: Installing The 1U Slim Rail Rack Mount Kit For Four-Post Racks (Xbr-000291)

    Review the installation and facility requirements for your product before mounting the device. Refer to the hardware installation guide for your product for more information. Use Electronic Industries Association (EIA) standard racks. Time and items required Allow 15 to 30 minutes to complete this procedure. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 37: Parts List

    CAUTION The device must be turned off and disconnected from the fabric during this procedure. Parts List The following parts are provided with the 1U Slim Rail Rack Mount Kit for Four-Post Racks (XBR-000291). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 38: Attaching The Front Brackets

    Not all parts may be used with certain installations depending on the device type. CAUTION Use the screws specified in the procedure. Using longer screws can damage the device. Attaching the front brackets Complete the following steps to attach the front brackets to the device. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 39: Installing The Device In The Rack

    The rails in the Slim Rail Rack Mount Kit (XBR-R000291) have been specially designed for the following devices. Because this device is slightly wider than other devices, the rails are narrower to account for the additional width. Do not attempt to mount the device with standard rail kits. ∙ Brocade 6505 Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 40: Attaching The Rear Brackets To The Front Brackets

    Position the right rear bracket inside the right front bracket as shown in the following figure. Attach the brackets using four 6-32 x 1/4 in. screws. Adjust the brackets to rack depth and tighten the screws to a torque of 9 in-lb (10 cm-kg). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 41: Attaching The Rear Brackets To The Rack Rails

    The rack kit is designed so that the device is installed with the non-port side flush with the front posts of the rack. NOTE Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing into the rack. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 42: Installation Requirements

    Use the screws specified in the procedure. Using longer screws can damage the device. Parts list The following parts are provided with the 1U and 2U Non-Port Side Fixed-Mount Rack Kit (15"-20") for Four-Post Racks (XNA-000072 and XNA-100072). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 43: Attaching The Front Brackets

    There are four pairs of vertically aligned holes in the brackets. Refer the following figure. Each pair is labeled with a letter as are a number of single holes along the length of the bracket. Each letter corresponds to the mounting for a specific device. The letters and matching devices are as follows: ∙ B = 6505 Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 44 Repeat step 1 through step 3 to attach the left front bracket to the left side of the device. Again, be sure that the arrowhead is pointing upward when mounted and that you are using the holes with the same labels as you used on the right side. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 45: Installing The Device In The Rack

    Attach the left front bracket to the left front rack post using two 10-32 x 5/8-in. screws and two nuts and tighten all 10-32 x 5/8-in. screws to a torque of 25 in-lb (29 cm-kg). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 46: Attaching The Rear Brackets To The Front Brackets

    Adjust the brackets to the rack depth and tighten the 6-32 x 1/4-in. screws to a torque of 9 in-lb (10 cm-kg). Repeat step 1 through step 3 to attach the left rear bracket to the left front bracket. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 47: Attaching Rear Brackets To The Rack Posts

    Attach the left rear bracket to the left rear rack post using two 10-32 x 5/8-in. screws and two retainer nuts and tighten all the 10-32 x 5/8-in. screws to a torque of 25 in-lb (29 cm-kg). Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 48 Mounting the Device FIGURE 23 Attaching the rear bracket to the rack post Bracket, front right Retainer nuts, 10-32, square or round holes as needed Bracket, rear right Screws, 10-32 x 5/8 in., panhead Phillips Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 49: Initial Setup And Verification

    Fabric OS Native and Access Gateway modes...............................54 Once you have set up the Brocade 6505 in a rack or as a standalone switch, it is time to apply power and a basic configuration. If you are going to use the Brocade 6505 in a single-switch setup, you can use EZSwitchSetup to complete the basic configuration. For EZSwitchSetup Software Installation Guide for Brocade 6505 .
  • Page 50: Creating A Serial Connection

    Switch IP address You can configure the Brocade 6505 with a static IP address, or you can use a Dynamic Host Configuration Protocol (DHCP) server to set the IP address of the switch. DHCP is enabled by default. The Brocade 6505 supports both IPv4 and IPv6.
  • Page 51: Date And Time Settings

    The Brocade 6505 maintains the current date and time inside a battery-backed real-time clock (RTC) circuit. Date and time are used for time stamping log events. Switch operation does not depend on the date and time; a Brocade 6505 with an incorrect date and time value still functions properly.
  • Page 52: Setting The Date

    The following procedure describes how to set the current time zone to Central Standard time using timezonename mode. Log in to the switch using the default password (which is password). Enter the tsTimeZone command as follows: timezonename to set the time zone by time zone ID, such as PST or Country/City. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 53: Synchronizing Local Time Using Ntp

    Brocade Inter-Switch Link (ISL) Trunking is optional software that allows you to create trunking groups of ISLs between adjacent switches. Up to eight ports within a port group on the Brocade 6505 can be used as a trunking group to achieve speeds up to 128 Gbps (256 Gbps full duplex) for optimal bandwidth utilization and load balancing.
  • Page 54: Brocade Switchstatus Policy

    DOWN and MARGINAL for both the Bad PowerSupplies and Bad Fans. You can use the switchStatusPolicyShow command to see the results of your changes. Fabric OS Native and Access Gateway modes The Brocade 6505 can function in either Fabric OS Native mode or Brocade Access Gateway mode. The switch is shipped in Fabric OS Native mode by default. ∙...
  • Page 55: Access Gateway Default Port Mapping

    Access Gateway cannot be connected directly into an array; it requires a fabric to support NPIV. ∙ Fabric OS features available to the Brocade 6505 depend on whether the switch is configured in Access Gateway or Fabric OS Brocade Access Gateway Administrator’s Guide Native mode.
  • Page 56: Disabling Access Gateway Mode

    Enter switchDisable to disable the switch. Access Gateway mode can only be disabled or enabled when the switch is in a disabled state. Enter ag --modeDisable to disable Access Gateway mode. Enter the ag --modeshow command to verify that Access Gateway mode is disabled. switch:admin> ag --modeshow Access Gateway mode is NOT enabled Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 57: Monitoring The Device

    Brocade 6505 maintenance......................................61 Powering the Brocade 6505 on and off Complete the following steps to power on the Brocade 6505. These steps apply to the base model of the switch which has a single power supply. Connect the power cord to the power connector on the power supply and fan assembly.
  • Page 58: Led Locations

    LED locations The following figure shows the LED locations on the port side of the Brocade 6505. The port status LEDs for the FC ports are arranged left and right to correspond to the upper and lower ports respectively in each pair. Refer to...
  • Page 59: Led Patterns

    Monitoring the Device FIGURE 26 LEDs on the non-port side of Brocade 6505 Power supply and fan assembly #1 status LED LED patterns The following table describes the port side LEDs and their behavior. TABLE 4 Port side LED patterns during normal operation...
  • Page 60: Post And Boot Specifications

    POST can be omitted after subsequent reboots by using the fastboot command or entering the diagDisablePost command to persistently disable POST. Fabric OS Command Reference Manual . For more information about these commands, refer to the Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 61: Post

    For information about error messages, refer to the Brocade 6505 maintenance The Brocade 6505 is designed for high availability and low failure; it does not require any regular physical maintenance. Maintenance includes running diagnostic tests and checking and replacing field-replaceable units, described in the following sections.
  • Page 62: Installing An Sfp+ Transceiver

    Installing an SFP+ transceiver The Brocade 6505 only supports Brocade-branded 8 Gbps and 16 Gbps SFP+ optical transceivers. For the Fibre Channel connections, the Brocade 6505 uses SFP+ transceivers that support any combination of Short Wavelength (SWL), Long Wavelength (LWL), and Extended Long Wavelength (ELWL) optical media.
  • Page 63: Diagnostic Tests

    Diagnostic tests run at link speeds of 2, 4, 8, or 16 Gbps depending on the speed of the link being tested and the type of port. NOTE Diagnostic tests might temporarily lock the transmit and receive speed of the links during diagnostic testing. Fabric OS Troubleshooting and Diagnostics Guide . For information about specific diagnostic tests, see the Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 64 Monitoring the Device Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 65: Removal And Replacement Of Power Supplies And Fans

    FRU replacement if the conditions specified in the procedure are followed. The base model Brocade 6505 has one power supply and fan assembly, as displayed in the following figure. Fabric OS identifies the assemblies from right to left on the nonport side. Even though they are contained within a single unit, the power supply and fan components are identified separately.
  • Page 66: Removing And Replacing A Power Supply And Fan Assembly

    NOTE The Brocade 6505 has a flexible fan policy. In a switch with two power supply and fan assemblies installed, if FRU #2 (on the left when viewed from the non-port side of the switch) is removed, the fan speed in FRU #1 does NOT accelerate to high speed.
  • Page 67: Determining The Need To Replace A Power Supply And Fan Assembly

    (the one not being replaced) has been powered on for at least four seconds and has a steady green LED. If the Brocade 6505 has two power supply and fan assemblies, skip to step 3. If the Brocade 6505 has only one power supply and fan assembly, enter the sysShutDown command before powering off the assembly to maintain the reliability of the system.
  • Page 68: Replacing A Power Supply And Fan Assembly

    Product labels Replacing a power supply and fan assembly Complete the following steps to replace a combined power supply and fan assembly in a Brocade 6505. CAUTION The power supply switch must be in the off position when you insert the power supply into the chassis. Damage to the switch can result if a live power supply is installed.
  • Page 69: Adding A Second Power Supply And Fan Assembly In A Brocade 6505

    Power on the unit by switching the AC power switch to the I symbol. Verify that the LED on the new power supply and fan assembly displays a steady green light while the Brocade 6505 is operating. If the LED is not a steady green, ensure that the power supply is securely installed and seated properly.
  • Page 70 = 1 switch.status.policy.PowerSupplies.marginal = 0 switch.status.policy.Fans.down:1 switch.status.policy.Fans.marginal:0 Brocade For more details on executing the switchStatusPolicyShow and switchStatusPolicySet commands,please refer to the Fabric OS Command Reference Manual . Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 71: Brocade 6505 Switch Technical Specifications

    Brocade 6505 Switch Technical Specifications This document highlights the features and specifications for the Brocade 6505 switch. System specifications System component Description Enclosure 1U, back-to-front airflow (port-side exhaust), power from back Power inlet Power supplies The base switch includes a single hot-swappable power supply with integrated system cooling fans. As an option, a duplicate of the primary PSU can be installed to provide redundancy.
  • Page 72: Weight And Physical Dimensions

    One power supply and fan assembly LED above the AC power switch on each power supply on the non-port side of the switch. Weight and physical dimensions Fully loaded Brocade 6505 switch: One power supply and fan assembly, and no SFP+ transceivers installed. Model Height...
  • Page 73: Power Consumption (Per Psu)

    Name Number Description Brocade 6505 switch 12 or 24 Fibre Channel ports in the Brocade 6505 switch are compatible with SWL, LWL, and ELWL SFP+ transceivers (for 16-Gbps performance). Fibre Channel data transmission ranges Port speed (Gbps) Cable size (microns)
  • Page 74: Serial Port Specifications (Protocol)

    Brocade 6505 Switch Technical Specifications Signal Description Logic ground UART2_TXD Transmit data Not supported Not supported NOTE These specifications are for connectors on Brocade platform only. Serial port specifications (protocol) Parameter Value Baud 9600 Data bits Parity None Stop bits...
  • Page 75: Regulatory Compliance (Environmental)

    Brocade 6505 Switch Technical Specifications Regulatory compliance (environmental) ∙ 2014/35/EU and 2014/30/EU ∙ 2011/65/EU - Restriction of the use of certain hazardous substance in electrical and electronic equipment (EU RoHS). ∙ 2012/19/EU - Waste electrical and electronic equipment (EU WEEE).
  • Page 76 Brocade 6505 Switch Technical Specifications Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 77: Regulatory Statements

    The standards compliance label on this device contains the CE mark which indicates that this system conforms to the provisions of the following European Council directives, laws, and standards: ∙ Electromagnetic Compatibility (EMC) Directive 2004/108/EEC ∙ Low Voltage Directive (LVD) 2006/95/EC ∙ EN50082-2/EN55024:1998 (European Immunity Requirements) – EN61000-3-2/JEIDA (European and Japanese Harmonics Spec) – EN61000-3-3 Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 78: China Cc Statement

    This equipment has been tested and complies with the limits for a Class A computing device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 79: Germany

    This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment (VCCI). If this equipment is used in a domestic environment, radio disturbance might arise. When such trouble occurs, the user might be required to take corrective actions. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 80 Regulatory Statements Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 81: Cautions And Danger Notices

    Asegúrese de que la dirección del flujo de aire de la unidad de alimentación se corresponda con la de la bandeja del ventilador instalada. Los dispositivos de alimentación y las bandejas del ventilador están etiquetadas claramente con una flecha verde y una "E" o con una flecha naranja y una "I". Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 82: Electrical Cautions

    CAUTION Carefully follow the mechanical guides on each side of the power supply slot and make sure the power supply is properly inserted in the guides. Never insert the power supply upside down. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 83: Danger Notices

    Pour des raisons de sécurité, la dragonne ESD doit contenir une résistance de série 1 méga ohm. PELIGRO Por razones de seguridad, la correa de muñeca ESD deberá contener un resistor en serie de 1 mega ohmio. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 84 Risque d'explosion en cas de remplacement de la pile par un modèle incorrect. Débarrassez-vous des piles usagées conformément aux instructions. PELIGRO Riesgo de explosión si se sustituye la batería por una de tipo incorrecto. Deshágase de las baterías usadas de acuerdo con las instrucciones. Brocade 6505 Hardware Installation Guide 53-1002449-09...
  • Page 85: Dangers Related To Equipment Weight

    Vérifiez que le bâti abritant le dispositif est bien fixé afin qu'il ne devienne pas instable ou qu'il ne risque pas de tomber. PELIGRO Verifique que el bastidor que alberga el instrumento está asegurado correctamente para evitar que pueda hacerse inestable o que caiga. Brocade 6505 Hardware Installation Guide 53-1002449-09...