TABLE OF CONTENTS Section Page Safety summary Description General Turbo-V60 controller description Controller specifications Controller outline Installation General Line voltage selection Power interconnections Input/Output interconnections Turbo-V pump connection Operation General Start-up Soft Start mode deselection Starting the pump Pump shutdown...
WARNING! Warning are used when failure to observe instructions or precautions could result in injury or death. CAUTION! Cautions are used when failure to observe instructions could result in damage to equipment, whether Varian supplied or other associated equipment. NOTE Infomation to aid the operator in obtaining the best performance from the equipment.
SECTION I - DESCRIPTION 1-1 General 1-2 Turbo-V60 controller description The Turbo-V60 Leak Detector PCB controller is a microprocessor-controlled, solid-state, frequency The controller is a solid-state frequency converter converter with self-diagnostic and protection features. which is driven by a single chip microcomputer. The...
SECTION I - DESCRIPTION 1-3 Controller specifications 1-4 Controller outline The outline dimensions for the Turbo-V60 Leak Input: Detector PCB controller are shown in Fig. 1-1. Two ranges selectables on Voltage a three pin connector on the transformer primary: - 120 Vac±20%, - 220 Vac±20%,...
SECTION II - INSTALLATION The line voltage selection is done on the three pin male 2-1 General connector on the primary wires of the transformer: Inspect the controller for any shipping damage. − for 120 Vac connect the line wires as follows: –...
SECTION II - INSTALLATION 2-4 Input/Output interconnections INPUT SIGNAL CONTROL UNIT All the input/output signals to the controller must be LOGIC LEVEL CONDITION connected at J15 mating connector (see Fig. 2-2). LOW FREQUENCY HIGH HIGH FREQUENCY HIGH HIGH FREQUENCY HIGH HIGH LOW FREQUENCY Pin 3-8 Output Normal optically isolated from the...
SECTION III - OPERATION 3-1 General 3-3 Soft Start mode deselection Make all vacuum manifold and electrical connections The Soft Start mode is enabled and disabled by means and refer to Turbo-V pump instruction manual prior to of a jumper located on the controller PCB. operating the Turbo-V controller.
SECTION III - OPERATION 3-5 Pump shutdown To shutdown the pump it is necessary to set the Input A and Input B signals on J15 connector both to high logic level. 3-6 Power failure In the event of a power failure (momentary or long term), the Turbo-V controller will stop the turbopump.
Replacement controllers are available on an advance a) DC voltage test exchange basis through Varian. necessary, Check the DC voltages referring to test points indicated information is provided to aid the operator in in Fig. 4-2. Refer also to Figg. 4-3 and 4-4. The meter...
Page 14
SECTION IV - MAINTENANCE During start-up After start-up DISPOSAL without Soft Start mode Meaning of the "WEEE" logo found in labels With With 78Ω With 48Ω With The following symbol is applied in accordance with the 48Ω dummy dummy 78Ω EC WEEE (Waste Electrical and Electronic Equipment) dummy load...
Page 15
SECTION IV - MAINTENANCE Figure 4-1 87-900-865-01 (B)
Page 16
NOTE: If a product is received at Varian which is contaminated with a toxic or hazardous material that was not disclosed, the customer will be held responsible for all costs incurred to ensure the safe handling of the product, and is liable for any harm or injury to Varian employees as well as to any third party occurring as a result of exposure to toxic or hazardous materials present in the product.
Page 17
Request for Return FAILURE REPORT TURBO PUMPS and TURBOCONTROLLERS POSITION PARAMETERS Power: Rotational Speed: Does not start Noise Vertical Current: Inlet Pressure: Does not spin freely Vibrations Horizontal Temp 1: Foreline Pressure: Does not reach full speed Leak Upside-down Mechanical Contact Overtemperature Other: Temp 2:...
Page 18
Toll Free # 1 (800) 882 7426 Tel: 00 800 234 234 00 vtt.technical.support@varianinc.com China Mexico Varian Technologies - Beijing Varian, S. de R.L. de C.V. Rm 1648 Central Tower South Wing Concepcion Beistegui No 109 China Beijing Junefield Plaza Col Del Valle No.
Need help?
Do you have a question about the Turbo-V60 and is the answer not in the manual?
Questions and answers