1.INITIAL CHECK LIST
1.1 Initial Check List
Assembly and Disassembly:
Antistatic measure
Be sure to use an antistatic wrist strap when assembling or disassembling.
Measuring environment
Before using major measuring tools (Light Source, AF Chart Stand, or Standard Tool Lens),
be sure to make an inspection and keep a record of the result routinely.
Reliability Parts
Insure that the following parts are correctly in place during final reassembly.
Insulation tape
Fig. 001
Prevents breaking of wires
Fig. 003
Fig. 002
Prevents breaking of wires
Fig. 004
1
Repair Information
Insulation tape