Download Print this page

Installation; Maintenance - Siemens V-2030 Instruction Manual

Gas control unit

Advertisement

OPERATING MANUAL
GAS CONTROL UNIT V-2030
CONTENTS
Note:
This instruction manual contains different customary equipment combinations.
Please disregard those details which do not apply to the ordered equipment and refer
to the supplied packing list.
1.
GENERAL
1.1
Introduction
1.2
Technical data
1.3
Modes of control
2.
THEORY OF OPERATION
Flow diagram
Typical installation
3.

INSTALLATION

3.1
Gas Control Unit V-2030
3.2
Gas Connections
3.2.1
Gas Manifold (pressurized)
3.2.2
Manifold "for Cl2 Liquid Chlorine via Evaporator"
3.2.3
Manifold "Bulk Tank Supply"
3.2.4
Automatic Switchover
3.2.5
Pressure Regulating / Check Valve including
Safety Valves
3.3
Safety vent line
3.4
Injector
3.5
Solution Discharge Line
3.6
Point of Application
3.7
Operating Water Connection
4.
PREPARATION AND START OF OPERATION
5.
STOPPING
6.

MAINTENANCE

Fault finding, remedies
Permissible length of connection vacuum lines
Adjustment procedure for V-notch positioner
V2030LE_iss1_0406.doc
LAE3185.001, LAE3406, LAE3908
BZ-1133-1, -2
BZ-1154
BZ-1002
22.06.06
1
1
1
2
2
3a, b
4
5
5
6
6
6
6
7
7
7
7
8
8
8
9
11
11
13
15
1-4

Advertisement

loading