Lsg Mark Ii High Power (Low Pressure) - Ultratec G3000 Operator's Manual

Lsg mark ii
Hide thumbs Also See for G3000:
Table of Contents

Advertisement

10. Open Liquid valve(s) fully, by turning counter-clockwise
11. When the G3000 is up to operating temperature, turn on the fog button on the remote control. The CO2 will
be activated first. After the appropriate delay time passes smoke issue will start. You will know when the gas
has been purged from the supply hose by the difference in noise that the LSG Mark II makes.
12. Verify cool temperature output using your hand, by passing it through the fog output noting the temperature.

LSG Mark II High Power (low pressure)

The LSG High Power features dual (low pressure) valve operation as well as variable fan speed. The valves can be
operated independently for 50% flow, 100% flow or combined 50% boost (150%). Both fan speed and valve
activation are controlled by either the handheld remote or the DMX Interface - both included.
Remote:
50% button controls - relay 1
100% button controls - relay 2
Fan Speed dial controls fan, from ccw = off to cw = full speed
DMX Control:
Channel x controls Fan Speed < 25% = off
Channel x + 1 controls 50% Flow (or relay 1)
Channel x + 2 controls 100% Flow (or relay 2)
9
www.ultratecfx.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents