Preparation Before Installation - Daikin FDQ16PY1 Installation Manual

Duct connection type
Hide thumbs Also See for FDQ16PY1:
Table of Contents

Advertisement

PREPARATION BEFORE INSTALLATION

Support plate
Control box
6
1. Installation of support plate of the control box
• Install the support plate of the control box to
the air conditioner.
2. Moving the control box
• Remove the control box from the air condi-
tioner and install it to the support plate.
• After removing the control box, please
retighten the screws to their original posi-
tions.
• When moving the control box, do not apply
force to the wiring.
• Tie down any remaining strong current
(motor wiring) to the support plate with wire
clamps.
• Fix any remaining weak current (thermistor
wire, signal wire of motor valve and floating
switch) with wire clamps.
Wire through hole
View
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdq20py1Fdq16pylFdq20pyl

Table of Contents