Preparation Before Installation - Daikin FUA100AVEB Installation Manual

Hide thumbs Also See for FUA100AVEB:
Table of Contents

Advertisement

4. PREPARATION BEFORE INSTALLATION

(1) Check the locations of indoor unit hanging bolts, piping outlet holes, drain piping outlet hole and
electric wirings inlet hole. (The drawing shows the view from the ceiling.)
(Refer to Fig. 5 and Fig. 6)
950
835 (hanging bolt pitch)
Locations of upward gas
piping and drain connection
105
141
179
8
(unit [mm])
Gas piping
Liquid piping
Fig. 5
Locations of backward gas
piping and drain connection
105
132
140
Drain connection outlet
(VP20)
(unit [mm])
Locations of rightward gas
piping and drain connection
14
198
Fig. 6
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fua71avebFua125avebFua-a

Table of Contents